APQP Lifecycle · IATF 16949 Readiness

One system of record for APQP and IATF 16949.

New product introduction and compliance readiness in a single platform: requirements, risk, deliverables, phase gates, evidence, audits and corrective actions engineered as one governed workflow.

Connected

APQP phases and IATF clauses on one thread, so a requirement change moves the risk, the control plan and the gate with it.

Intelligent

Readiness scored only from verified evidence, never from a checkbox or a status field someone typed.

Governed

Gates, audits and corrective actions fully traceable to the person, the artefact and the date.

01 — The problem

Quality planning is spread across a dozen places at once.

APQP rarely fails because a team is careless. It fails because the record is fragmented, so every gate review starts with a reconstruction and every audit starts with a search.

01

Requirements live in PDFs

Customer requirements and special characteristics get re-typed into spreadsheets that quietly drift from the source.

02

Risk never reaches the floor

PFMEA revisions stop in an inbox, and the control plan running on the line is two revisions behind the risk.

03

Gate reviews run on memory

Readiness is argued in a meeting instead of read from evidence with an owner, a revision and a date.

04

Audit prep is a scramble

PPAP and IATF evidence is assembled the week before the audit rather than maintained as a byproduct of the work.

02 — The platform

Every APQP and IATF artefact, connected.

Nine modules on one data model. A change in requirements moves the risk, the control plan and the gate, instead of waiting for someone to notice.

Requirements & Voice of Customer

Customer requirements, special characteristics and regulatory inputs captured once and traced to design, process and inspection.

Risk — DFMEA & PFMEA

Failure modes linked to characteristics, control plan lines and actions, with revision history on every assessment.

Control Plans

Built from the risk and the process flow, revision-controlled, and issued to the line with the release it belongs to.

Deliverables & Evidence

Every phase deliverable carries an owner, a due date and the artefact that satisfies it. Nothing closes on a promise.

Phase Gates

Gate criteria, readiness checks and sign-off, recorded with who accepted what and when.

PPAP

Element checklists, submission levels and customer-specific requirements tracked to acceptance.

Internal Audits

Clause coverage, layered process audits and findings that become corrective actions without a second tracker.

Corrective Actions

From finding to root cause, containment, verification of effectiveness and closure evidence.

Clause Traceability

Each IATF 16949 clause mapped to the live evidence that satisfies it, ready to retrieve on request.

03 — The lifecycle

The five APQP phases, with gates that mean something.

Each phase carries its deliverables and its exit criteria. A gate opens on evidence that is present, current and verified, not on the fact that a meeting happened.

Phase 01

Plan & Define the Program

Voice of the customer, cross-functional team, timing plan and the initial special characteristics are agreed before design work starts.

Deliverables

  • Customer requirements
  • Team & timing plan
  • Initial special characteristics

Gate exit

Program charter and timing plan approved

04 — Evidence integrity

Readiness scored only from verified evidence.

A deliverable is not done because a file was uploaded. It is done when it is verified, current, and linked to the requirement it satisfies. Core IQ scores readiness from that record and from nothing else.

Gate readiness — Phase 03

2 of 4 verified
  • Special characteristics tracedVerified
  • PFMEA linked to control planVerified
  • MSA study — revision CSuperseded
  • PPAP element 11Awaiting evidence

Verified or excluded

Unverified, expired or superseded artefacts never contribute to a readiness score.

One thread

Every point traces to the requirement, the risk and the person who signed the evidence.

Gates decide

A phase cannot exit on a verbal exception; the gate records who accepted what, and when.

Audit by retrieval

The audit pack is a query against the record, not a project that starts in week fifty.

05 — Compliance

IATF 16949 clauses mapped to the work that satisfies them.

Clause coverage is not a binder. Each clause points at the artefacts currently in force, so a surveillance audit becomes a retrieval exercise.

§4

Context of the organization

Scope, interested parties and the quality management system boundaries, versioned with the program.

§5

Leadership

Management commitment, quality policy and assigned process ownership per program.

§6

Planning

Risk and opportunity actions, objectives and change planning tied to the APQP timing plan.

§7

Support

Competence records, documented information control and revision history on every artefact.

§8

Operation

Design and development, control plans, release of products and services, and nonconformity handling.

§9

Performance evaluation

Internal audit results, process performance and management review inputs drawn from live data.

§10

Improvement

Corrective actions with root cause, effectiveness verification and lessons carried forward.

Coverage shown for the quality management system layer. Customer-specific requirements are configured per customer.

06 — Who it is for

One record, every role that touches the launch.

Automotive tier suppliers run APQP across quality, engineering, manufacturing and supply chain. Core IQ gives each role the view it needs without giving anyone a second copy of the truth.

01

Quality Manager

Sees readiness across every program at once, and knows which gate is at risk before the review starts.

02

APQP / Program Lead

Runs the timing plan, deliverables and gate criteria for one launch, with the evidence attached where the work happens.

03

Supplier Quality Engineer

Tracks PPAP status and open corrective actions across the supply base against the same requirement set.

04

Manufacturing Engineer

Works from the current control plan and PFMEA, not a printout from the last revision.

05

Internal Auditor

Builds an audit programme from clause coverage and findings, then closes actions in the same record.

07 — Questions

What quality teams ask first.

08 — Next step

Request a demo of Core IQ.

Bring one program you are launching now. We will show you the same record the way your team would work it, from requirements through gate exit.

  • 01A 30-minute working session with the team that built it.
  • 02We map one live program to the APQP lifecycle, gates and evidence.
  • 03You leave with a readiness view built from your own deliverables.

Already have an account? Log in to the platform

Used only to arrange your demo. No marketing list, no resale.